Lesotho Highlands Water Project: H9-H13

Lesotho Highlands Water Project: H9-H13

4.11 - 1251 ratings - Source

CHAPTER H12-4 TRANSMISSION SUBSTATIONS H12-4.1 SUBSTATION DEVELOPMENT AND SINGLE LINE DIAGRAMS Table H12-3.1 summarizes the ... Phase I It is expected that a 132 kV substation will exist at Maseru at the commencement of Phase I. Additional bays will be ... need for an infeed into the local 33 kV network, provision is shown in the diagram for a switchgear bay for such an infeed.

Title:Lesotho Highlands Water Project: H9-H13
Author:Lahmeyer McDonald Consortium, Olivier Shand Consortium, Lesotho. Ministry of Water, Energy and Mining, Lesotho. Ministry of Water, Energy, and Mining
Publisher: - 1986


You Must CONTINUE and create a free account to access unlimited downloads & streaming